Prayagraj Power Generation Co is planning to set up a cement grinding unit in Jodh Khansemra in Bara Tehsil in Allahabad district of Uttar Pradesh. The project involves setting up of 4.0 million tpa capacity cement grinding to utilize the fly ash generated by its 3x660 MW coal power plants. The total land requirement is 20.0 ha which is part of 773.10 Ha of land available within the power plant and is under possession. The project cost is estimated at Rs. 4500 million.
Project Location : Akbarpur, Haridwar district, Uttaranchal |
Aqua Infra Projects is planning to set up a Asbestos Cement Products unit in Uttaranchal. The project involves setting up a unit to produce Asbestos Cement Products (1,50,000 MTPA) and Fibre Reinforced Plastic Products (FRP 3,60,000 Metre, FRP Pipes and/other products) at Village Akbarpur Urd in Haridwar district of Uttaranchal. The project is estimated to cost Rs.920 million.
Project Location : Chunar, Mirzapur district, Uttar Pradesh |
Jaypee Chunar Cement Products is planning to set up an Asbestos Cement Sheet Manufacturing Plant (1,00,000 TPA) at Chunar in Mirzapur district of Uttar Pradesh. Asbestos fibre (6,000 TPA), Cement (48,000 TPA), Pulp (1,000 TPA) and Fly ash (28,000 TPA) will be used as raw materials. *Total land requirement is 20 acres. The project is estimated to cost Rs.370 million. As of September 2009, the project has obtained statutory clearances.
11,950 ₹ | 4950 ₹ | 4950 ₹ | 4950 ₹ | 3950 ₹ |
Copyright © 2013 Ibis Research Information Services Pvt Ltd. All Rights Reserved.
Contact : Ibis Research Information Services Pvt Ltd., 28, Rajaji Street, NGO Colony
Guduvancherry, Chennai -603 202 Mobile : 0-97898-37940 email : ibischennai@gmail.com Privacy Policy